Friday, May 10, 2019

Greenhouse Office Assignment Example | Topics and Well Written Essays - 1750 words

Greenhouse spotlight - Assignment ExampleThe parallel and series connections train to be checked. It was stated that the batteries were fully charged only when now the SG is low. The back-up generator should do the charging in this particular case because the PV array may not be able to give the required electricity generation.The solar array should also be checked for assertable defects. An inspection on the conduit and wiring associated with the array and the two governors should be d one and only(a), finding somewhat possible breaks or deterioration on exposed conduit and wiring. If there ar leaks or open wires, conduit and wiring should immediately be replaced or repaired if possible. Suppose however, that we cant find fault in the PV array and the wiring and conduit are all in normal and good condition. What do we do That fuses blow up is probably because of the overload, meaning it can not give the demand cater to its load, the appliances and lighting in the house.A poi nt from the generator and the array towards the bombardment charger and the regulators should be checked. There must be some leak here that prevents the barrage fire hope from charging. As we can see in our diagram, the energy generating phase goes to the energy storage phase or equipment composed of the batteries, their housing and any protection equipment. The organisations should use batteries which are designed for deep cycling applications and which are better suited to the charging and discharging regime typical of RAPS systems. There are two regulators each fed by half of the PV array. Can we point to the regulator as the possible culprit Or, possibly it can be one of the culprits, meaning we have here one or two faults or defects.A regulator is an electronic device which controls the voltage of the solar arrays energy output to charge the battery bank appropriately. An inspection is necessary on the functioning of the regulator to ensure that indicators or meters are co rrectly operating for the various regulator modes. When the batteries are fully charged, the regulator should be in the float mode. The regulators are connected to the battery charging equipment so that over voltage is not delivered to the battery. But the low SG in the batteries indicates that the charging equipment does not deliver the required power to be charged to the battery bank.The batteries can not work or can not have power without the charger, so this has to be in good working condition all the time. An old battery charger can cause trouble such as brownouts if it fails to charge the batteries which in turn bestow the inverter. The components in the circuit of the charging equipment also consist of heat-sinks. Overheating in the heat-sinks and components should be checked. There could be some damage in the charger.The battery chargers performance worsened during bad weather where leaks and open wires could expose the system to short circuit and malfunctioning. Another tr ouble could be pinpointed at the wiring connection between the regulator and the charger, but a thorough checking revealed that there was no leak, neither was there open wire, nor

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.